Headworks |
|
|
Diversion structure |
Free Flow Weir with a Drop Intake |
|
Length of weir |
5m |
|
Weir crest elevation |
EL 1160.79 msl |
|
Height of weir |
1.58 m |
|
Size of Drop Intake |
0.8 m width X 5 m length |
|
Depth of Intake |
0.5 m to 1 m |
|
Gravel Trap |
|
|
Canal Type |
Rectangular RCC Channel |
|
Dimension (width × height) |
1.4 × 1.4 – 1.9 m |
|
Bed Slope |
1:10 |
|
Length of Gravel Trap |
5m |
|
Particle to settle |
20 mm |
|
Desander |
|
|
Type |
Rectangular RCC |
|
Dimension (width × height) |
2.8 m × 2 – 2.5 m |
|
Length of effective basin |
24 m |
|
Length of Inlet Transition |
4.41 m |
|
Length of outlet Transition |
3.2 m |
|
Bed Slope |
1 in 50 |
|
Particle to settle |
0.20 mm |
|
Collection Pipe |
|
|
Conveyance Length |
564.0 m |
|
Type |
Mild Steel Welded Pipe |
|
Diameter |
0.514 m Internal dia. |
|
Thickness of Pipe |
6 mm |
|
Supports |
S/M Support with Concrete cap |
|
Number of Anchor Blocks |
16 nos. |